-

The high-temperature heat pump system of Jilin Petrochemical Company has …
On December 22, the author learned that the high-temperature heat pump system of the third thermal station, a key supporting project for the western transformation and upgrading of Jilin Petrochemical, was successfully put into operation.
-

The Tarim Oilfield has put more than 100 new wells into production this y…
As of December 21, the Tarim Oilfield has put 113 new wells into production this year, with a new crude oil production capacity of 1.0923 million tons and a natural gas production capacity of 2.234 billion cubic meters.
-

Qinghai Oilfield adopts multi-dimensional prevention and control measures…
On December 14th, as the Qaidam Basin entered the severe cold season, the lowest temperature dropped to minus 15 degrees Celsius. The Qinghai Oilfield intensified its winter safety hazard inspection and governance. Through multi-dimensional approaches such as full
-

The Daqing Oilfield has maintained a stable output of over 10 million ton…
As of December 3rd, Daqing Oilfield, the worlds largest research and production base for tertiary oil recovery, has achieved a tertiary oil recovery output of over 10 million tons in 2025, maintaining
-

Zhejiang Oilfield has set a new domestic record for deep shale gas drilli…
On November 28th, it was learned that the Daan 1H28-4 well, located in the Linjiang syncline of the Daan block in western Chongqing, was successfully drilled.
Company news
Industry information
Technical knowledge
View mobile website