-

Yumen oilfield has entered the era of "pipeline natural gas transmis…
At 15:58 on November 12, with the opening of the second valve chamber ** of Qinggao Line (Qing1 gas collection station to Gaoshawo), natural gas in Ningqing block of Yumen Oilfield was smoothly injected into Qinggao Line pipeline,
-

SINTERN VALVE & CASTING MFG.CO.,LTD
-

Profitable oil is produced from rock joint in Tuha oilfield
Since the beginning of this year, Tuha Oilfield has established a "highway" for shale oil, tight oil and other reservoirs through various
-

Valve performance testing
1. Inspection of appearance and logoCheck content: whether the appearance of the valve has defects, such as cracks,
-

To build a new model of low-carbon and efficient surface system in Dagang…
On August 22, the oil and gas produced by the oil Wells under the supervision of Wangxuzhuang Oilfield in Dagang was directly transported to the joint station,
Company news
Industry information
Technical knowledge
View mobile website